|

Rapp-it Steel Putty is included with every Rapp-it Pipe Repair Bandage.
Application
- Roughen and clean the area to be repaired. Cut or twist off required amount.
- Mix by kneading with fingers to a uniform colour. If mixing is difficult, warm putty to room temperature.
- Apply to surface within two minutes of mixing. Force into any cracks or holes and strike off excess material.
Application Hints and Tips
- When applying to damp, wet or slowly leaking areas, work the mixed epoxy putty forcefully into the surface and apply pressure until adhesion begins to take effect.
- Use damp fingers for easier mixing, application and a smooth cured appearance. Remove excess material before hardening begins.
- Curing: Steel Putty has a 4-7 minute work life. After 5-10 minutes it hardens and forms a tenacious bond. Final cure occurs in 60 minutes.
Specifications
- Hardness, Shore D (full cure): 75 - 85
- Heat Resistance: 150°C (300°F)
- Chemical Resistance: Resistant to hydrocarbons, ketones, alcohols, esters, halocarbons, aqueous salt solutions, and dilute acids and bases
Read more about Rapp-it Steel Putty:
For more information on Rapp-it Steel Putty, please contact us.
|
|